day 8. when we arrived on site one side of our tarp (we cover our units with tarps to prevent problems) had fallen in. so i had to carefully remove the surface dirt without taking out any other dirt. after that we excavated the rest of our Feature 4 oxidized soil and the rest of our level 4 dirt which was only still in the SE corner. about that SE corner, nothing seems to touch it but dirt. if anything interesting happens anywhere in our unit it does NOT happen in the SE corner. we cleaned up our walls and put the stuff we found in a separate bag because it was coming from all levels. anyway after that we excavated our level 5 dirt. when we finish a level we measure and map in anything bigger than a fist (mostly rocks) we fill in our paperwork, we measure how deep we have dug from the line level we have tied to the NW corner nail (a large nail in each corner to mark the unit with a string going around the perimeter). then we take a photo. the excess dirt from the excavation is carefully collected and dumped in a bucket. the bucket dirt is then screened. (it just occurred to me that i had not explained that) then we take our paperwork and bag of artifacts from the level (or feature) down to the lab where the papers are filed and the artifacts are cleaned and sorted and labeled. after finishing level 5 we excavated level 6. levels 4 and 5 had a boatload of rocks which made things difficult for us and slow-going. level 6 had less rocks. had more tourists today. they had seen us on the news and read about us in the paper and came up just to see our excavations. we have not found any mortar yet which would tell us we hit foundation rocks.
an important thing to note is the fact that the further down we go the less we find. we find less bits of glass and nails and such. but what we DO find is bigger stuff. bigger pieces of glass, bigger nails, we found a couple of bottlenecks today (one of them even had some cork still in it!) we found a can lid and some bones (including a rib) it has been an adventure. on monday people will be shifting around. i don't know if i will stay at the opera house or if i will be moving up to Barbary Coast.
all these chronicles and i never mentioned the other units at our site. there are 3 more that the other students are working on. one is down by the road where the back of the opera house was. they are excavating where the stage used to be. they just started this week and are only down to their second level. the other 2 units are right next to each other and are in the alleyway on the south side of the opera house. they are looking for the trash that was thrown away and (if they are really lucky) the alleyway itself which could have been rock, brick, or just dirt.
if you have any questions about anything at all just ask.
3 comments:
Huh?
Oh, oops, I don't think that's the question you're looking for.
O.K., next question: If you're site is on a slope, are the layers dug on a slope, or are they dug straight down so that the dig is straight except for the top edges?
MW
.. straight down, meaning the dig in the hole is always level like a floor, or is it angled to the same angle as the top? (The challenge here is trying to figure out how to word my question so it is understandable.)
MW
at this particular site we dig down according to stratigraphy. so we stop when the soil changes at whatever depth it happens to be. however if a soil level is more than 10 cm deep we stop, fill out paper work and get new paperwork for whatever is left. so it goes both by soil type and slope/angle. but the emphasis is on soil type.
Post a Comment